MHB were recently commissioned by AMCO to carry out remedial works design for a steel girder bridge at Inverroy on the West Highland Line between Roy Bridge and Spean Bridge Stations.

The works initially involved design of a temporary timber deck to allow the bridge to be used for cattle and pedestrians only. This was followed by the design of extensive repairs to the existing steel trough decking and metalwork repairs to the main girder.

The bridge was finished with a concrete deck overlay suitable for farm traffic.