MHB provided various design services to Barr during the construction of the ASDA in Barrhead in 2014. This included:

  • Advice on earthworks suitability for structural fill and car park construction to minimise the amount of imported material to the site.
  • Advice on ground improvement by lime stabilisation.
  • Foundation advice for the design of a 6m high timber crib wall.
  • Design checks for slope stability during installation of buried culvert.